Once all the LED light assemblies have been placed, they can be screwed into place using the same screws that were
removed to remove the light cover plate. It is crucial that you do not over tighten the LED light assemblies to the firebox. It
may cause the glass to break or the gasket to not form a proper seal to the firebox. Tighten the screws until they are snug.
After the light assemblies are screwed into place, the power source and control module can be placed on to the floor of
the unit behind the front right access panel that was removed. Place these components to the right of the floor heat shield
as shown. Place the controller so that the SET button is accessible from the top access panel for future use.