EasyManua.ls Logo

METREL MI 2094 User Manual

METREL MI 2094
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CE MultiTester
MI 2094
User Manual
Version 3.0, Code No. 20 751 557

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the METREL MI 2094 and is the answer not in the manual?

METREL MI 2094 Specifications

General IconGeneral
BrandMETREL
ModelMI 2094
CategoryTest Equipment
LanguageEnglish

Summary

General Presentation

Warnings and Notes

Safety warnings and operational guidance for safe use of the CE Multitester.

Warranty Information

Details regarding the product's warranty terms and conditions.

List of Measurements

Overview of all measurements the instrument is capable of performing.

Applicable Standards

Standards the instrument is designed and tested in accordance with.

Instrument Description

Technical Specifications

Withstanding Test (PROG.HV and HV)

Technical details for performing high voltage withstand tests.

Burn Out (HV Position)

Specifications for the burn-out test function.

Low Resistance (Continuity)

Technical details for low resistance and continuity measurements.

Voltage Drop Scaled to 10 A~

Specifications for voltage drop measurements at 10A.

Insulation Resistance

Technical specifications for insulation resistance testing.

PE Leakage Current

Specifications for measuring PE leakage current.

Substitute Leakage Current

Technical details for substitute leakage current measurements.

Touch Leakage Current

Specifications for touch leakage current measurements.

Functional Test

Technical details for performing functional tests.

Discharge Time (DISC.TIME)

Specifications for discharge time measurement.

General Specifications

General technical specifications and parameters of the instrument.

General Specs and Environmental Conditions

Overall instrument specs, operating ranges, and protection.

Measurements

Withstanding Test Procedure

Procedure and safety precautions for performing withstand tests.

Withstanding Test with Preset Voltage/Time

How to perform withstand tests with programmed voltage/time sequences.

Low Resistance Test (0.1A/0.2A/10A/25A~)

Performing low resistance tests with specified currents.

Voltage Drop Scaled to 10 A~

How to measure voltage drop scaled to 10A.

Insulation Resistance Measurement

Procedure for measuring insulation resistance of objects.

Discharge Time - External (MAINS TEST)

Measuring discharge time on external components.

Discharge Time - Internal

Measuring discharge time of internal components.

Leakage Current Measurement

How to perform leakage current measurements.

Substitute Leakage Current Test

Performing substitute leakage current tests.

Touch Leakage Current Test

Performing touch leakage current measurements.

Functional Test Procedure

How to conduct functional tests on equipment.

Autotest Functionality

Utilizing autotest for automated measurement sequences.

Operation

Operational Warnings

Important warnings and information during instrument operation.

Results Memory Management

How results are stored, organized, and managed in memory.

Recalling Stored Results

Procedure for accessing and reviewing saved measurement results.

Communication Features

Utilizing USB and RS232 for instrument communication.

RS232 Interface Details

Details on the RS232 serial communication interface.

Transferring Data to PC

Steps to transfer measurement data from the instrument to a PC.

System Configuration

Configuring instrument settings like date, time, and ports.

Display Contrast Adjustment

Adjusting the display contrast for readability.

Remote Control Pedal Usage

How to use the optional remote control pedal for operation.

Warning Lamp Usage

Understanding and using the visual indicator lamp.

Barcode Reader Integration

Connecting and using a barcode reader for data input.

EXT/DOOR Input Signals

Utilizing external signals for control and results.

DOOR Input Configuration

Configuring and using the door interlock input.

EXTERNAL Input Signals

Utilizing external signals for control and results.

Maintenance

Metrological Check Recommendation

Importance and recommendation for regular instrument calibration.

Service and Repair Information

Information on obtaining repair services for the instrument.

Cleaning Instructions

Guidelines for cleaning the instrument's exterior.

Fuse Replacement Procedure

Procedure for fuse replacement, emphasizing qualified personnel.

PC Software - CE Link

Installing CE Link Software

Steps for installing the CE Link software on a PC.

CE Link Software Introduction

Overview of the CE Link software's capabilities and setup.

Downloading Data to PC

Process for downloading measurement data from the instrument to PC.

Opening Data Files

How to open and view previously downloaded data files.

Printing Documents

Options for printing measurement reports and data.

Printing Selected Rows

Selecting and printing specific rows of measurement data.

Print Separately Function

Printing individual reports for each tested object.

Header Programming

Customizing headers for printed documents and reports.

Sequence Editor Usage

Using the editor to create and manage autotest sequences.

Related product manuals