15
3.8 Fire protection
• Wheninstallingontheroof,thePVmodulesmayonly
beinstalledoverare-resistantroofcover("hardroof").
Thisexcludesthein-roofinstallationofthePVmodules.
4. Maintenance & cleaning
4.1 Maintenance
•Itisrecommendedtohavethesystemcheckedregularly
(annually)byaninstaller.Theinspectionintervalmayvary
depending on local circumstances/conditions/regulations.
•Checkglasssurface,frameandconnectionsfordamage.
•Checktheelectricalcomponentsforcorrosionandgood
connection contact.
•Ifamoduleneedstobereplaced,observetheinstructions
fordisassemblyandassembly(seeSections3and6).
Thereplacementmoduleshouldhavethesameelectrical
properties.
•Aeranunusualweatherevent(storm,hail,alotofsnow,
etc.),themodulesmustbecheckedfordamage.
•ThevegetationunderthePVmodulesmustbecutback
regularlytoavoidshadingonthePVmodules.
4.2 Cleaning
•Usesucientwaterandasoclothtocleanthe
PVmodules.
•ThePVmodulesmustonlybecleanedmanually.
•Donotusehigh-pressurecleanersforcleaning.
•AllowthePVmodulestocooldownbeforecleaning.
•Nevertouchglasswithbarehandsasthismayleave
ngerprints.
•Theuseofaggressivecleaners,ethanolandisopropanol,
dilutedalcohol,acetoneandanychemicalcleaning
agentsisnotpermitted,asthismaydamagetheanti-
reectivecoating(ARC)ofthemodule.
•Theuseofacids,alkalis,bleachpowdersandstrongbases
is not permitted.
•Theingredientsofcleaningproductsshouldbechecked
before use.
•Donotusedeionizedwaterforcleaning.
•Theuseofabrasivecleaningagentssuchassanding
powder,steelwool,scrapersandsteelcleaning
equipment is not permitted.
•Careshouldbetakenwhencleaningifsandorheavy
soilingispresenttoavoidscratches.
•Toremoveheavysoiling,usegenerousamountsofwater
beforewipingtheglasssurface.Stubborndirtshouldbe
soakedifnecessary.
•Carefullyremoveleaves,snow,iceorotherloosedirtwith
asobroom.
•Damagetotheanti-reectivecoating(ARC)dueto
impropercleaningwillvoidtheperformancewarranty.
Improper installation can lead to res/
rehazards. Observeallnecessarylocal,
regional and national buildingandre
protectionregulations,ordinancesaswell
asalltechnical,electricalandstructural
standardswhendesigningandinstalling
thePVsystem.