EasyManua.ls Logo

MFJ MFJ-941EK - Page 15

MFJ MFJ-941EK
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MFJ-941EK Tuner Kit Instruction Manual
- 14 -
CONSTRUCTION
On the chassis, locate the balun transformer mounting hole (approximately 2" in
front of the terminal posts and ground post). Refer to Diagram 8 below:
KEP Nut
Metal Washer
1-1/4" FG Washer
4:1 Balun
1"Screw
1/4" Spacer
Diagram 8: Balun Mounting
[ ] Insert the 1" machine screw up through the bottom of the chassis.
[ ] Install a 1-1/4" fiberglass washer followed by the 1/4" nylon spacer on top.
[ ] Install the balun over the spacer, orienting leads toward the back panel.
[ ] Install the second 1-1/4" fiberglass washer to sandwich the balun in place.
[ ] Install a #6 flat washer and KEP nut. Tighten, but don't crush balun windings.
[ ] Locate B&W twisted lead on balun. Install on the ground-post lug and solder.
[ ] Trim and install the white lead on either BALANCED LINE post and solder.
[ ] Trim and install the black lead on the other BALANCED LINE post and solder.
Find the following items to prepare for installing the SWR meter:
(1) 2-1/2" Precision Cross-Needle SWR Meter
(1) Molded Plastic Meter-Mount Bracket
(2) #6 x 3/8" Sheet Metal Screw
(3) .01 uF Disc Ceramic Capacitors (marked 103)

Related product manuals