Indoor unit installation
150 Installation
3.5.3 Install the pendant bolt
① Ceiling installation
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
② Floor standing installation
Fix the hook with tapping screw onto the wall.(Refer to picture below)
3.5.4 Install the main body
① Ceiling installation (The only installation method for the unit with drain pump)
Remove the side board and the grille. (For models 48 and 60, do not remove the grille.)
Locate the hanging arm on the hanging screw bolt. (for some of the models 60, do not do this). Prepare the