Maintenance and
Disassembly
Page 27
1.3.2 Outdoor Unit
Evacuation for the whole system
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
56+4
)259+
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
<GI[[SV[SV
Procedure:
1. Confirm that the 2- and 3-way valves are opened.
2. Connect the vacuum pump to the 3-way valve’s
service port.
3. Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4. Close the valve (Low side) on the charge set and turn
off the vacuum pump.
Wait for five minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
5. Disconnect the charge hose from the vacuum pump.
6. Mount the caps of service port and 2- and 3-way
valves.
7. Use a torque wrench to tighten the caps to a torque
of 18N.m.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea MISSION2 3D INVERTER Series and is the answer not in the manual?

Midea MISSION2 3D INVERTER Series Specifications

General IconGeneral
BrandMidea
ModelMISSION2 3D INVERTER Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals