EasyManua.ls Logo

Midea MSC-09HRDN1-QD0(E) - Re-air Purging (Re-installation)

Midea MSC-09HRDN1-QD0(E)
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
7. Installation details
7.1 Wrench torque sheet for installation
Outside diameter Torque
mm inch Kgf.m
Ф6.35 1/4 1.8
Ф9.52 3/8 4.2
Ф12.7 1/2 5.5
Ф15.88 5/8 6.6
7.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
7K 9K 12K
mm
2
1.5 1.5 1.5
7.3 Pipe length and the elevation
Pipe size
Capacity
Btu/h
Gas Liquid
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Length
A (m)
Additional
refrigerant
(g/m)
3/8’’ (Ф9.52)
1/4’’ (Ф6.35)
5 8 15 30
7k~12K
1/2’’ (Ф12.7)
1/4’’ (Ф6.35)
5 8 15 30
1/2’’ (Ф12.7)
1/4’’ (Ф6.35)
5 8 15 30
5/8’’ (Ф15.88)
1/4’’ (Ф6.35)
5 10 20 30
18K~28K
5/8’’ (Ф15.88)
3/8’’ (Ф9.52)
5 10 20 65
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.

Related product manuals