The  insulation  material  at  the  joint  pipe 
shall be banded to the gap pipe and liquid pipe 
tightly. 
  The linking part should be use glue to paste 
together 
  Be  sure  not  bind  the  insulation  material 
over-tight, it may extrude out the air in the 
material to cause bad insulation and cause 
easy aging of the material. 
13.8.2  Insulation of drainage pipe 
1  Operational  procedure  of  refrigerant 
pipe insulation 
Select  the  suitable  pipe  →  insulation  (except 
joint section) → piping layout and connection→ 
drainage test→ insulate the joint parts 
 
2  Purpose of drainage pipe insulation 
The temperature of condensate drainage water 
is very low. If insulation is not enough, it shall 
form  dew  and  cause  leakage  to  damage  the 
house decoration.   
3  Insulation  material  selection  for 
drainage pipe 
  The  insulation  material  should  be  flame 
retardant material, the flame retardancy of 
the  material  should  be  selected  according 
to the local law. 
  Thickness  of  insulation  layer  is  usually 
above 10mm. 
  Use  specific  glue  to  paste  the  seam  of 
insulation  material,  and  then  bind  with 
adhesive tape. The width of tape shall not 
be less than 5cm. Make sure it is firm and 
avoid dew.   
 
4  Installation and highlights of insulation 
construction 
  The single pipe should be insulated before 
connecting  to  another  pipe,  the  joint  part 
should be insulated after the drainage test. 
  There should be no insulation gap between 
the insulation material. 
 
14.9 Engineering of electrical wiring 
1  Highlights  of  electrical  wiring 
installation 
  All  field  wiring  construction  should  be 
finished by qualified electrician. 
  Air  conditioning  equipment  should  be 
grounded  according  to  the  local  electrical 
regulations. 
  Current  leakage  protection  switch  should 
be installed. 
  Do  not  connect  the  power  wire  to  the 
terminal of signal wire. 
  When power wire is parallel with signal wire, 
put wires to their own wire tube and remain 
at least 300mm gap. 
  According  to  table  in  indoor  part  named 
“the  specification  of  the  power”  to  choose 
the  wiring,  make  sure  the  selected  wiring 
not  small  than  the  date  showing  in  the 
table. 
  Select  different  colors  for  different  wire 
according to relevant regulations.   
  Do not use metal wire tube at the place with 
acid  or  alkali  corrosion,  adopt  plastic  wire 
tube to replace it. 
  There must be not wire connect joint in the 
wire tube If joint is a must, set a connection 
box at the place. 
  The wiring with different voltage should not 
be in one wire tube. 
  Ensure that the color of the wires of outdoor 
and the terminal No. are same as those of 
indoor unit respectively. 
14.10 Test operation 
1  The  test  operation  must  be  carried  out 
after  the  entire  installation  has  been   
completed. 
2  Please  confirm  the  following  points 
before the test operation. 
  The  indoor  unit  and  outdoor  unit  are 
installed properly. 
  Tubing and wiring are correctly completed. 
  The  refrigerant  pipe  system  is 
leakage-checked. 
  The drainage is unimpeded. 
  The ground wiring is connected correctly. 
  The  length  of  the  tubing  and  the  added 
stow capacity of the refrigerant have been 
recorded. 
  The power voltage fits the rated voltage of 
the air conditioner. 
  There is no obstacle at the outlet and inlet 
of the outdoor and indoor units.