EasyManua.ls Logo

Minebea CSD-903-EX - 4-3. CALIBRATION PROCEDURES

Minebea CSD-903-EX
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
4-3. Calibration procedures
4-3-1. Flow of calibration
Step1 Connect the load cell with this instrument.
Step2 Please energize.
Step3 Please set the bridge power supply.
Step4 To stabilize this unit and the measuring section (load cell); please
make the instrument to the status of energizing for about 10 min.
Step5 Please switch the mode to the calibration mode.
Step6 Please set the scale interval.
Step7 Please set weighing capacity.
Step8 Please set the mass of the weight put on the measuring section.
Step9 Please execute the calibration of the zero point with nothing put on
the measuring section, or by setting the output voltage value of the
zero point of the load cell.
Step10 Please executes the calibration of span by putting the weight on the
measuring section, or by setting the output voltage value of the
span point of the load cell.
Step11 Please quit from the calibration mode. Process the setting since
step 12 showing as follows if necessary.
Paragraph 4-3-2
Switch to the calibration
mode
Paragraph 4-3-3
Set the scale interval
Paragraph 4-3-4
Set the weighing capacity
Paragraph 4-3-6
Calibration at zero point
Paragraph 4-3-7
Calibration at span
Connection with load cell
Paragraph 4-3-8
Quit the calibration
Paragraph 4-3-5
Set the mass of the weight
Energy for 10 min after
power is turned on.
to Paragraph 6-1
Set the display
position of
decimal point
to Paragraph 6-4
Set of the unit
to Paragraph 4-5
Digital linearize
to Paragraph 6-12
Automatic range
switch
to Paragraph 6-11
Gravity
acceleration
Step13 Step14 Step15
Energizing powe
r
supply
Paragraph 6-5
Set the bridge power supply.
Step12
Step16

Related product manuals