EasyManua.ls Logo

Mira Sprint 7.5 - Page 26

Mira Sprint 7.5
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
Heater Tank - Removal and Installation
Inlet Connector
Clamp Bracket
Heater Tank
Clamp Bracket
Retaining Screws
Heater Tank
Retaining Screws
Outlet Connector
Solenoid Valve
Thermal Switch
Flow Valve and
Switch Assembly
4.13. Refit the components in reverse order. Make sure that the electrical wires are
installed in the correct positions.
5. Thermal Switch - Removal and Installation
WARNING! Isolate the electrical and water supplies before removing the cover. Mains
electricity connections are exposed when the cover is removed.
5.1. Remove the three cover retaining screws, the cover and the service tunnel.
5.2. Remove the hose from the outlet connector and loosen the connection to the inlet
connector assembly.
5.3. Remove the screw that holds the terminal block in position. This will give you
sufficient room to carry out the procedure without disconnecting any mains
electrical wiring.

Related product manuals