1
Low Pressure
H
ig
h
M
e
d
iu
m
L
o
w
Stop
Te
m
p
e
ra
tu
r
e
S
e
rv
ic
e
5
6
4
7
3
8
2
9
1
1
Low Pressure
H
ig
h
M
e
d
iu
m
L
o
w
Stop
S
to
re
2
3
4
5
Te
m
p
e
r
a
tu
re
Flow
Flow
S
e
rv
ic
e
Maintenance Guide
Operation &B
Installation
ELECTRIC SHOWERS
Standard & MemoryStandard & Memory
Standard & MemoryStandard & Memory
Standard & Memory
models coveredmodels covered
models coveredmodels covered
models covered
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USERTHESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USERTHESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Other manuals for Mira Advance

Question and Answer IconNeed help?

Do you have a question about the Mira Advance and is the answer not in the manual?

Mira Advance Specifications

General IconGeneral
Temperature ControlThermostatic
Warranty2 Years
Power Ratings9.8 kW
Water Connection15 mm
Outlet Connection1/2"
Water Pressure0.7 - 10 bar
Cable Entry PointsBottom entry
Safety FeaturesOverheat protection
ApprovalsWRAS

Summary

Important Safety Information

General Safety Warnings

Provides essential safety precautions and warnings for operating the Mira Advance shower.

Emergency Procedures

Details conditions requiring immediate action and when to contact support.

Mira Advance Wiring Diagram

Installation Requirements

Electrical Installation Requirements

Mira Advance Installation

Initial Cover Removal

Step-by-step instructions for safely removing the Mira Advance unit cover.

Installation Steps

Positioning and Pipe Connection

Guidelines for unit positioning, swiveling the inlet connector, and connecting the water supply.

Installation Process

Flushing Water Supply Pipe

Emphasizes thoroughly flushing the water supply pipe before connecting the unit.

Securing the Unit

Instructions for drilling fixing holes and securing the Mira Advance to the wall.

Priming and Electrical Connections

Priming the Mira Advance Unit

Procedure to fill the unit with water and expel air for optimal performance.

Electrical Cable Preparation

Instructions for stripping cable insulation and fitting the earth sleeve.

Finalizing Installation

Earth Bonding and Cover Refitting

Checking earth bonding, connecting the multi-connector, and refitting the unit cover.

Commissioning the Mira Advance

Initial Setup and Hose Connection

Connecting the flexible hose and setting the temperature to cold.

Flow Setting Checks

Testing the 'LOW' flow button and checking for water flow and priming.

Commissioning Procedures

Flow and Temperature Calibration

Testing 'MEDIUM' and 'HIGH' flow, adjusting temperature, and calibrating settings.

Final Shutdown Sequence

Pressing the 'STOP' button to complete the commissioning and shutdown process.

Operation and User Advice

Understanding Mira Advance Performance

Mira Advance User Operation

Memory Control Model Operation

Storing Memory Presets

Operator Fault Diagnosis

Troubleshooting Common Malfunctions

Guide for users to identify and resolve common shower problems with indicator key.

Installer Fault Diagnosis

Installer Warnings and Key

Critical safety warnings for installers and explanation of diagnostic indicators.

Installer Troubleshooting Guide

Advanced Fault Diagnosis

Further Installer Fault Diagnosis

Maintenance Procedures

Component Renewal Procedures

Temperature and Filter Maintenance

Inlet and Flow Valve Maintenance

Flow Valve and Turbine Maintenance

Element and Sensor Assembly Maintenance

Maximum Temperature Setting

Related product manuals