EasyManua.ls Logo

MIRAGE SYSTEMS G4 - Proper Bridle Routing for Main Container; Standard Right-Handed Main Deployment Routing; Incorrect Bridle Routing Warning

MIRAGE SYSTEMS G4
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
Proper Bridle Routing for Main Container
Proper routing of the main bridle for standard right!
handed main deployment [Fig" #]" Note that the bridle
passes from the right of the container$ to the pin$ and
back out to the right" It does not cross over the %& flap"
IMPORTANT:
Do not cross the main bridle from left
side to right side of the main pin cover flap$ as this may
cause a slow deployment or a main pilot chute in tow
[Fig" &]" The bridle must be routed on the same side of
the main pin cover as the bridle is routed into the main
pilot chute pouch"
Fig" #
Fig" &
Incorrect routing
MIRAGE SYSTEMS