EasyManua.ls Logo

Mitsubishi MELSEC Q Series Structured Programming Manual

Mitsubishi MELSEC Q Series
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
5.1 Type Conversion Functions
5.1.14 Word (signed), double word (signed) type
time type conversion
5-43
5
APPLICATION
FUNCTIONS
INT_TO_TIME(_E),
DINT_TO_TIME(_E)
INT_TO_TIME(_E), DINT_TO_TIME(_E)
Operation result
(1) Function without EN/ENO
An operation is executed and the operation value is output from .
(2) Function with EN/ENO
The following table shows the executing conditions and operation results.
*1 When FALSE is output from ENO, the data output from is undefined.
In this case, create a program so that the data output from is not used.
EN ENO
TRUE (Operation execution) TRUE Operation output value
FALSE (Operation stop)
FALSE
*1
Undefined value
d
d
d
d

Table of Contents

Other manuals for Mitsubishi MELSEC Q Series

Questions and Answers:

Mitsubishi MELSEC Q Series Specifications

General IconGeneral
SeriesMELSEC Q Series
TypeModular PLC
Programming SoftwareGX Works2, GX Works3
CategoryProgrammable Logic Controller (PLC)
I/O ModulesDigital I/O, Analog I/O, High-Speed Counter, Positioning
CommunicationEthernet, CC-Link
Programming LanguagesLadder Logic, Structured Text, Function Block Diagram, Sequential Function Chart, Instruction List
MemoryFlash Memory
I/O PointsUp to 4096 points (expandable with additional modules)
Power SupplyAC or DC power supply options available, depending on the base unit and modules.
MountingDIN rail mounting
Operating Temperature0°C to 55°C
Storage Temperature-25°C to 75°C
Humidity5% to 95% (non-condensing)
Vibration Resistance10 to 57 Hz, 0.075mm amplitude
WeightVaries depending on the module, from a few grams to several kilograms.
Shock Resistance147 m/s² (3 times each in X, Y, Z directions)

Related product manuals