87
-
'13 • SRK-T-142
Names of recommended signal wires
Terminal
block for
Super link
E board
Terminal
block for
iterface
Y
X
Y
X
DIP switch
(SW2-2)
XR1~4 are for the DC 12V relay
XR
5 is a DC 12/24V or AC 220~240V relay
CNT connector (local) maker, model
Connector Molex 5264-06
Molex 5263TTerminals
DIP switch
(SW2-3)
DIP switch
(SW2-1)
Operation output
Output 1
Output 2
Output 3
Output 4
Input/
Output
ContentFunction
Relay ON/OFF
Output signal
Heating output
Compressor operation output
Malfunction output
XR
1
During air-conditioner operation
XR
2
During heating operation
XR
3
During compressor running
XR
4
ON
ON
ON
ON During anomalous stop
Input
Input/
Output
Operation by
Remote Control
Air-
Conditioner
Function
Setting Setting Content
SW2-1 SW2-3
Input signal
Level/Pulse
XR
5
OFFON
ONOFF
OFFON
ONOFF
OFFON
OFFON
ONOFF
ON
OFF
OFF
OFF
OFFON
ONOFF
ON
OFF
Allowed
Not allowed
Allowed
Not allowed
External input
Operation permission
Operation prohibition
External input
Operation permission
Operation prohibition
External
control
input
ON* Level input
OFF
ON*
OFF
ON*
OFF
Pulse input
Level
Level
Pulse
Shielded wire
Vinyl cabtyre round cord
Vinyl cabtyre round cable
Vinyl insulated wirevinyl sheathed cable for control
It is available to operate the air conditioning unit and to monitor the operation status with the external control unit (remote display)
by sending the input/output signal through CNT connector on the indoor control PCB.
Connect a external remote control unit (procured locally)
to CNT terminal.
In case of the pulse input, switch OFF the DIP switch
SW2-1 on the interface PCB.
When setting operation permission/prohibition mode,
switch OFF the DIP switch SW2-3 on the interface PCB.
Connection of super link E board
Functions of CNT connector
Switch ON the DIP switch SW2-2 (Factory setting: ON) on the interface PCB.
Wiring connection between the interface and the super link E board.
Clamp the connection cables with cable clamps.
Regarding the connection of super link E board, refer to the instruction manual of super link E board.
For electrical work, power supply for all of units in the super link system
must be turned OFF.
Caution:Wireless remote control attached to the indoor unit can be used in parallel, after
connecting the wired remote control. However, some of functions other than
the basic functions such as RUN/STOP, Temperature Setting, etc. may not work
properly and may have a mismatch between the display and the actual behavior.
No.
1
2
3
4
Within 200 m 0.5 mm
2
s 2 cores
Within 300 m 0.75 mm
2
s 2 cores
Within 400 m 1.25 mm
2
s 2 cores
Within 600 m 2.0 mm
2
s 2 cores
* Factory setting
Interface side Super link E board
Indoor units
control box
Do not use the length over 2 meter
CNT
(Blue 6P)
Common
Output 1
Output 2
Output 3
Output 4
Remote start / stop button or timer point
Butt splice
(Application coverage
0.751.25mm
2
)
Remote start/stop kit (procured locally)
0.75mm
2
×2m
Note (1) 0.3mm
2
×2m
Red
Black
Yellow
Blue
Brown
Orange
White
Black
Yellow
Blue
Brown
Orange
Orange
Input
power
+12
PCB (Printed Circuit Board)
XR1
XR1
XR2
XR3
XR4
XR2
XR3
XR4
XR5
XR5
1 1
2 2
3 3
4 4
5 5
6 6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi SRK63ZM-S and is the answer not in the manual?

Mitsubishi SRK63ZM-S Specifications

General IconGeneral
BrandMitsubishi
ModelSRK63ZM-S
CategoryAir Conditioner
LanguageEnglish

Related product manuals