EasyManua.ls Logo

Mooney M20B - General Control Surface Information; Control Surface Removal and Installation

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION
VI
CONTROL
SURFXCES
A.
GEN~ERAL
The
ailerons,
elevator,
and
rudder
on
the
AIOONEY
Al
20
B
are
of
all-metal
con-
struction.
They
are
jig-built,
using
hinges
of
machined
extrusions.
The
elevator
an
rudder
incorporate
an
unusual
method
of
construction.
The
leading-edge
spar
of
´•these
controls
consists
of
a
specially
designed
extrusion
that
allows
flush
attachement
of
the
ski~l.
Lead
counterweights
are
provided
for
dynamic
balancing
to
prevent
flutter.
The
control
system
requires
veSylittle
maintenance
and
provides
superior
control-
feel,
because
tubes,
rather
than
the’conventional
cable
system,
are
used
to
actuate
the
controls.
Helm
bearings
are
used
throughout
the
controlsystem.
These
bearings
are
simple
and,
dependable
and
require
very
little
maintenance.
B.
INSTALLATION
1.
Removal
and
installation
df
Aileron
(2200).
a.
Rt´•move~control
tube
(7241)
from
inboard
end
of
aileron.
b.
Remove
bolts,
nuts,
washers
from
three
attach
hinges.
c.
Remove
aileron
by
pulling
straight
back.
d.
Replacement
is
accomplished
by
reversing
of
above
steps.
e.
Rig
the
ailerons
in
accordance
with
factory
rigging
instructions.
2.
Removal-and
Installation
of
Rudder
(4104).
a;
Remove
the
rudder
controltube
(4169).~by
taking
off
one´•
bolt,
nut,
and
washer.
b.
Remove
bolts,
nuts
and
washers
from
three
attaching
hinges.
c.
Remove
the
rudder
by
pulling
straight
back.
d.
Replacement
is
accomplished
by
reversing
df
above
steps.
e.
Rig
the
rudder
in
accordance
with
factory
rigging
instructions.
3.
Removal
and
Installation
of
Elevators
(4103).
a.
Remove
control
tube
(7224-5)
and
assist
bungee
j’i038-1)
by
taking
off
at-
thc´•hing.bol~ts,
nuts,
and
washers
on
each
elevator.
b.
Remove
bolts,
nuts
and
washers
from
four
attaching
hingeson
each
elevator.
c.
Remove
elevator
by
pulling
straight
back.
d.
Replacement
is
accomplished
by
reversing
above
steps.
e.
Rig
the
elevators
in
accordance
with
factoryrigging
instructions.
4..
Removal
and
Installation
of~Flapst
a.
Remove
Wing-flap
hinge
fairing
(3979)
to
expose
flap
link
(7100).
b.
Remove
flap
link
(7100)
by
taking
off
one
bolt,
nut,
and
washer
from
flap
attachment.
c.
Bimove
flap
by
pulling
down
and
out.
---d.
--Replacement
is
accomplished
by
reversing
above
steps.
e.
Rig
the
flaps
in
accordance
withe
factoryrigging
instructions.
op
OLDWILLWAYNE

Related product manuals