b) Power supply need to be grounded (Judging method: test the live wire and the
neutral wire of the main socket with multimeter. The voltage between live and
ground should equal to the voltage of local electrical grid, and the voltage
between neutral and ground should equal to 0. Otherwise, the power supply is
not grounded correctly.)
c) Test the voltage stability before using. If the voltage is unstable, use a voltage
regulator to adjust. Otherwise, the control panel and transformer may be easily
damaged
1.5. Installation
1.5.1. Remove all the package materials
1.5.2. Check the surface of the base cabinet and the main body to make sure there is no
scratch, deformation or foreign bodies
1.5.3. Move the whole equipment
as close as possible to the final installation place
NOTE: Do NOT turnover, disassemble or slant the cabinet during
transportation.
1.5.4. Position the base cabinet to the final location where an appropriate power supply is
nearby; and brake the caster to stabilize the base cabinet
1.5.5. Make sure the voltage and frequency of power supply is same as the required value
which is shown on the label. Take out the power cord from the packaging box and
connect it with the female power cord connector on the main body. Plug in the other end
to connect a power supply
1.5.6. Press the “ ” button on the control panel to power on the equipment. Afterwards,
press the “ ” button to raise the front window, take out the accessories from the
operating area and remove the work table as shown in the picture below. Lastly, power
off the equipment and prepare for installation.