EasyManua.ls Logo

MTU 8V2000Mx4x - Page 86

MTU 8V2000Mx4x
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing injector
1. Prior to installation, remove all blanking
plugs.
2. Fit new O-rings on injector and coat with as-
sembly compound.
3. Secure new sealing ring with assembly com-
pound on injector, observing installation posi-
tion of sealing ring.
4. Clean sealing surface on cylinder head and
protective sleeve.
5. Insert injector (1) in cylinder head, ensuring
that it is correctly aligned with the HP line
connection.
6. Fit hold-down clamp (3) in correct installation
position, coat screw (2) with engine oil.
7. Screw in screw (2) and tighten by hand.
8. Coat thread and sealing cone of HP line (5)
and injector (1) with engine oil.
9. Align injector (1) and HP line (5) with align-
ment device.
10. Connect HP line (5) to HP accumulator and
tighten by hand.
11. Connect HP line (5) to injector (1) and tighten
by hand.
12. Tighten screw of hold-down clamp (3) with a box wrench adapter and a torque wrench to specified tightening
torque.
Name Size Type Lubricant Value/Standard
Screw M10 x 85 Tightening torque (Engine oil) 40 Nm + 4 Nm
13. Use socket wrench and torque wrench to tighten HP line (5) to the specified torque.
Name Size Type Lubricant Value/Standard
HP line Tightening torque (Engine oil) 30 Nm + 5 Nm
14. Attach cable (4).
Final steps
1. Install cylinder head cover (→ Page 83).
2. Open fuel supply to engine.
86 | Injector | MS150060/04E 2016-02
TIM-ID: 0000004650 - 005

Table of Contents

Related product manuals