EasyManua.ls Logo

MX C1 - Implement Unhitching - C+ Loaders

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
0.3 m
0.3 m
13
Modification reserved 19, rue de Rennes BP 83221 • F - 35690 ACIGNÉ
6.6 Raise the implement horizontally to 0.30 m from the
ground.
6.7 Lock the loader frame on the bracket with the pins and split
pins.
Fold the parking stands away.
7. IMPLEMENT UNHITCHING - C+ LOADERS
Caution
This operation must be carried out by the driver who must leave the seat and
ensure all manoeuvres are forbidden while he is working on the loader.
7.1 Select a stable parking area.
Lower the implement horizontally to 0.30 m from the
ground.
Pull the parking brake. Turn off the engine.

Related product manuals