36
13. Put the Right Shroud in position and reinstall the Right
Crank Arm. Installation does not require the use of the crank
puller.
Note: Before fully attaching the Shrouds, check the belt
tension. Refer to the “Belt Tension Adjustment”
procedure.
14. Before fully attaching the Shrouds, power up the
machine to verify that the Flywheel can move freely.
Machine is on. Current is active. There is risk
RIHOHFWULFDOVKRFN%HVXUHWRNHHS¿QJHUV
FOHDURIDOOSLQFKKD]DUGVZKHQ\RXFKDQJH
the resistance level.
15. The remainder of reassembly is the reverse procedure.
16. Final Inspection
Inspect your machine to ensure that all hardware is tight and
components are properly assembled.
!
Do not use until the machine has been fully
assembled and inspected for correct performance
LQDFFRUGDQFHZLWKWKH2ZQHU¶V0DQXDO