Installation of the Boiler
General Guidelines:
1. The boiler should only be installed by qualified installers with a
"Certificate for installation and service of small biofuel plant“
and must be installed according to AT guidance on technical equipment - B.4.8
(only applicable in DK)
2. The boiler must not be installed on combustible surfaces.
3. The chimney pipe over the boiler must be installed with a
cleanout door and must be 500 mm in length above the
boiler as to allow for easy dismounting of the controller
cassette located at the back of the boiler. Install in a 90
degree chimney bend if necessary.
4. Chimney draft should be a minimum 5 PA and be stable.
Overpressure must not occur.
Draft stabilizer
It is required to install a draft stabilizer.
5. The boiler must be installed with an approved
shunt.
Note: You may lose your warranty if failing to
install an approved shunt with your system.
Approved mixing valve