Installation of the Boiler.
A properly executed installation ensures that the system functions properly.
Both national/local guidelines and requirements must always be observed.
The boiler can be installed on a pressurized system up to max 2.5 bar.
1. Standard.
DHW with mechanical flow control.
2. DHW with 2 way valve.
Typically used when DHW is small
or when the surface coil is small.
Heat for the house is supplied while
hot water is being produced.
3. DHW with 3 way valve.
Typically used when the water heater is large,
and when the surface coil is large
The house is not supplied with heat
while producing hot water. The house must
therefore be able to manage without heat
for short periods during the winter .
4. Weather compensation.
Allows you to have a high temperature
on the boiler as well as manage the supply
temperature to the house in relationship to
the outside temperature and chill factor.
5. Weather compensation and solar heating