AP400 – All Types Installation Manual Page 17 of 34 © NEC Nederland B.V. 2011
1.12 UNPACKING
PROCEDURE: “Unpacking”.
Actions
1. Open the card board box and take the AP400 out.
2. Check the AP400 for any damage.
3. Continue with one of the following Chapters:
When you mount the AP400 vertically, the antenna position will normally be OK,
and when you do not need to install the G.729 Daughter Board, continue with
Chapter 4 MOUNTING THE AP400 AGAINST A WALL.
When you mount the AP400 horizontally, you must change the antenna position.
Consult Chapter 2. ADJUSTING THE ANTENNA POSITION.
When you require G.729 codec support, you will have to install the G.729
Daughter Board. Consult Chapter 3. MOUNTING THE G.729
DAUGHTERBOARD.