10
4 Unpacking and inspection
This chapter is intended for installers
All PowerRouter units are thoroughly tested and inspected before they are packed and 
transported. Although they are shipped in sturdy, recyclable packaging, damage may 
however still occur during transportation.
It is important to carefully inspect the shipping packaging prior to beginning the  
installation. If any external damage to the packaging makes you suspect the  
PowerRouter itself could be damaged, or if you nd that the PowerRouter is damaged 
after unpacking it, report the damage immediately to your installer and to the  
transportation company that delivered the PowerRouter. 
If it  becomes necessary to return the PowerRouter, please use the original packaging 
in which it was delivered.
The PowerRouter weights 18 kg including packaging. To avoid injury, 
ensure the use of proper lifting techniques and secure the help of a second 
person to assist in the unpacking and installation of the PowerRouter.
Figure 3  Unpacking 
PowerRouter box content:
1 PowerRouter PR50S
or
1 PowerRouter PR50S with PV-switch   
or
1 PowerRouter PR37S
or
1  PowerRouter  PR37S  with  PV-switch       
or 
1 PowerRouter PR30S
or
1 PowerRouter PR30S with PV-switch
1 wall-mounting bracket   
1 Pouch containing:
   1 Installation manual
   1 Installation sheet
   1 Drill template
part no. 9560688
part no. 9560947
part no. 9560874
part no. 9561145
part no. 9561161
part no. 9561188
part no. 5749034
part no. 5277337 
part no. 5277329
part no. 5555477
i