FX
2
Original/Chem
EN
10Appendix B: Maintenance checklist
Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise, a tick will suffice if the item has been performed or
considered.
WARNING!Risk of personal injury
Always read Chapter2Safety before installation, use, service, or troubleshooting of this product.
NOTE!
If a value is outside its accepted level, or a result is incorrect or missing, fix the problem before initial
start-up and normal operation.
Unit No. Date:
Operating hours:
Performed by:
Items to inspect Interval Accep-
ted
level
OK Repaired Replaced Part num-
ber
Dismantle the arm. Clean
the whole arm internally
and externally.
Annually
Adjust the links. Annually
Check the mounting of the
arm on wall, bench or ceil-
ing.
Annually
Check the airflow. If it is
reduced, the ventilation
system must be inspec-
ted.
Annually
After completing main-
tenance, carry out and
document the earthing
and conductivity tests.
Annually
20