EasyManua.ls Logo

Nederman FX2 Original - 10 Appendix B: Maintenance checklist

Nederman FX2 Original
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FX
2
Original/Chem
EN
10Appendix B: Maintenance checklist
Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise, a tick will suffice if the item has been performed or
considered.
WARNING!Risk of personal injury
Always read Chapter2Safety before installation, use, service, or troubleshooting of this product.
NOTE!
If a value is outside its accepted level, or a result is incorrect or missing, fix the problem before initial
start-up and normal operation.
Unit No. Date:
Operating hours:
Performed by:
Items to inspect Interval Accep-
ted
level
OK Repaired Replaced Part num-
ber
Dismantle the arm. Clean
the whole arm internally
and externally.
Annually
Adjust the links. Annually
Check the mounting of the
arm on wall, bench or ceil-
ing.
Annually
Check the airflow. If it is
reduced, the ventilation
system must be inspec-
ted.
Annually
After completing main-
tenance, carry out and
document the earthing
and conductivity tests.
Annually
20

Table of Contents

Related product manuals