NESPACE48/3K Operation Manual
Issue 1.0 March-2017
KE NESPACE KA Rectifier Control Unit Operation Manual English R 2016_07 V1_1
6 /21
Operate this system under the environmental conditions specified in
this manual.
Take particular attention to voltage, frequency, temperature, humidity
and vibrations. (Violating the environmental requirements may cause
an electric shock or fire.)
Before connecting the battery connections, load and gruonding wires,
pay attention not to reverse the polarity of them. (Polarity reversal
may cause fire.)
While the system is connected, do not touch any battery wire, load or
grounding wire ports. It may cause an electric shock or death.
Pay attention not to reverse the polarity of signaling cables and
detection cables when connected. (It may cause a fire.)
Do not leave excess or foreign materials (such as sheathes of
electric wires or hardware) on top of or inside the product. It may
cause an electric shock or fire.
The DC outputs are connected to the battery before the system starts
to be driven. Pay close attention not to cause an electric shock or
short circuit.
When the rectifier units are inserted into the shelf, be aware that the
live AC input voltage is fed to the Connector in the rack side. (It may
cause an electric shock.)
When you insert or remove a rectifier unit from or into the shelf, be
aware of the unit mey be hot enough to cause a burn injury.
Do not insert an object or finger into the ractifier unit fan. (It may
cause an injury.)
When handling rectifier units, pay close attention not to touch any
open connector pins. (It may cause an electric shock.)
When cables are connected, battery should be separated from the
rectifier system except one point of the conductor at each cell.
Start operation after all connections (battery, load, and grounding
wires/cables) are made but Circuit Breakers are OFF.
Connect the battery wire, load and grounding wire while the load side
has been unloaded and Circuit Breakers are OFF.
External transmission signal should be 60V level and ≤ 0.5A.
Rectifier unit should be inserted and removed using the guide rail of
the rectifier system, to engage connectors without damage.