EasyManua.ls Logo

Netafim NETAFLEX 3G - Page 17

Netafim NETAFLEX 3G
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NETAFLEX™ 3G INSTALLATION MANUAL
17
INSTALLATION
Stock tank connection
Connect the fertilizer lines to the NetaFlex™ 3G
(see Location of inlet, outlet and fertilizer/acid line connectors, page 13).
Three types of connection are available
Fittings (interchangeable)
Diameter
PVC, hose nozzle insert connector (installed) 16 mm
PVC, nipple - male thread connector (supplied) 1/2"
PVC, half union - female thread connector (supplied) 3/4"
Prior to flexi-tube connection, thread a stainless steel
band clamp
A
on each flexi-tube hose.
Heat the tip of each Flexi tube hose in boiling water
to make it flexible for insertion.
Connect flexi-tube hose from fertilizer lines to the hose-
nozzle-insert connectors of dosing channels
B
,
ensuring 12 meter (1.7 feet) of transparent, chemical-
resistant, reinforced PVC water hose with an internal
diameter of 16 mm that will not contract when there is
a vacuum in the system.
Attach the stainless steel band clamp on each flexi-tube
connection
C
and secure tightly.
Flexi-tube specification:
16 mm (½") reinforced EVA tubing.
Material: EVA (ethylene vinyl acetate) tube compound
specially formulated to meet USDA requirements.
Polyester cord reinforcement with color tracer.
Pressure: 18 to 20 Bar (250 to 300 PSI).
Recommended temperature range:
-23
o
C to +65
o
C (-10
o
F to +150
o
F).
TIP
You can rotate the hose connectors of the dosing
channels to face the desired direction according to
the location of the stock tanks.
Loosen the Rotameter's lower connector
A
, rotate
the hose connector to the desired direction
B
and
fasten the Rotameter's lower connector
A
.
B
C
A
A
B

Other manuals for Netafim NETAFLEX 3G

Related product manuals