EasyManuals Logo
Home>Netafim>Industrial Equipment>NETAFLEX 3G

Netafim NETAFLEX 3G Installation Manual

Netafim NETAFLEX 3G
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
NETAFLEX™ 3G INSTALLATION MANUAL
21
SYSTEM OPERATION
Measure the EC and pH control cycle
EC and pH control cycle is the time elapsed from the start of fertilizer or acid injection until the change
starts to be recorded by the EC and pH transmitter (usually 4-10 sec.).
To measure the NetaFlex™ 3G control cycle for pH*:
Run the NetaFlex™ 3G with fresh water only until the pH value stabilizes on the transmitter's display
(Deviation not greater than +0.1 -0.1).
Manually open the acid dosing channel and simultaneously start a timer.
Observe the pH value on the transmitter's display, as soon as it first reacts stop the timer.
We recommend to repeat the 3 previous steps 3 times and calculate the average time.
Enter the data into the controller
(NMC Pro - screen 7.7)
.
Stop the program.
*Time aplicable for EC and pH control cycle.
ATTENTION
Restore the settings of all the alarms back to the state where adequate
protection to the system and the crop is provided (see the Controller Manual).
If there is any problem during the process, see Troubleshooting in the NetaFlex™ 3G User Manual.

Other manuals for Netafim NETAFLEX 3G

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Netafim NETAFLEX 3G and is the answer not in the manual?

Netafim NETAFLEX 3G Specifications

General IconGeneral
BrandNetafim
ModelNETAFLEX 3G
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals