Do you have a question about the New Yorker AP-590U and is the answer not in the manual?
Lists relevant US standards for boiler installation and operation.
Defines hazard severity levels used throughout the manual.
Warning against storing flammable liquids near the boiler.
General warnings about improper installation, service, and maintenance.
Guidelines on suitable flooring and clearances for boiler installation.
Safety warnings regarding hot water, pressure, and ventilation.
Illustrates boiler dimensions and connection points.
Provides physical dimensions and capacity for different boiler models.
Details burner capacity, heating capacity, chimney requirements, and AFUE.
Instructions for inspecting the boiler shipment for damage.
Guidance on positioning the boiler and required clearances.
Steps for removing the boiler from its shipping crate and skid.
Guidelines for ensuring adequate air supply for combustion and ventilation.
Details for installing the optional floor shield.
Steps to design a piping system preventing oxygen contamination.
Diagram for integrating with a cooling system.
Instructions for installing the safety relief valve.
Importance and function of the air vent system.
Diagram for zoned heating systems with a supply circulator.
Diagram for zoned heating systems with zone valves.
Recommendations for tankless heater piping.
General rules for vent system installation and chimney requirements.
Discusses chimney suitability, heat loss, and condensation issues.
Illustrates proper smokepipe setup and chimney needs.
Shows acceptable and unacceptable draft regulator positions.
Electrical installation and grounding requirements.
Guidance on system wiring and controls, including priority zoning.
Instructions for thermostat installation and adjustment.
Wiring diagram for cold start control without tankless heater.
Wiring diagram for warm start control with tankless heater.
Wiring diagrams for different burner primary controls.
Guidelines for oil supply lines and filters.
Information on single-pipe oil line installations.
Details on two-pipe oil line systems.
Checklist before initiating burner start-up.
Procedure for filling and venting the heating system.
Pre-start checks for the oil burner.
Specifications for Beckett AFG burners.
Specifications for Riello 40 Series burners.
Details on setting burner electrode positions.
Instructions for Riello burner assembly and nozzle replacement.
Diagrams for Riello electrode, turbulator, and pump settings.
Steps for starting and adjusting burner settings during operation.
Information on servicing the cad cell and checking burner cut-off.
How to test thermostat and oil primary control operations.
Detailed safety checks for the oil primary control.
Procedure to verify the high limit control operation.
Verifying operation of controls on boilers with tankless heaters.
Operation sequence for boilers without tankless heaters.
Displays status codes and descriptions for boiler control.
Operation sequence for boilers with tankless heaters.
Location and basic use of the boiler control.
How to view boiler status and settings.
Procedure for adjusting boiler control parameters.
Lists adjustable parameters for cold start controls.
Lists adjustable parameters for warm start controls.
Detailed explanations of adjustable parameters.
Example of circulator pre-purge time settings.
Table showing DHW demand influence on system.
How ZC/ZR terminals integrate AP-U with other systems.
Table for zone request inputs and circulator status.
Table for external low limit control status.
How external low limit affects boiler control.
Maintenance steps for water boilers.
Procedure for filling the boiler and system with water.
Steps for cleaning a new boiler with boil-out compound.
How to perform pH and alkalinity tests on boiler water.
Warning about unattended boilers and freeze damage.
Steps for cleaning firetubes and combustion chamber.
Safety information and precautions for RCF products.
Measures to prevent inhalation of fiber dust.
First aid steps for contact with RCF materials.
Troubleshooting common combustion issues.
Troubleshooting fuel leaks, dirt, water, and cold oil problems.
Diagnosing issues based on flame appearance and noises.
Troubleshooting burner not coming on or shutting down.
Using the boiler control for diagnostics.
Guide for diagnosing system conditions and actions.
Lists boiler control error codes and corrective actions.
How to obtain replacement parts and contact customer service.
Diagram identifying jacket parts and controls.
List of AP-U series boiler repair parts with numbers.
Exploded view of bare boiler parts.
Continued list of AP-U series boiler repair parts.
Contact details for R.W. Beckett Corp. for parts.
Lists Beckett AFG burner parts for specific boiler models.
Diagram of Beckett AFG model burner with parts labeled.
Contact details for Riello for burner parts.
Safety warning regarding LWCO installation.
Recommended locations and types for LWCO installation.
Instructions for piping and wiring a LWCO.
Procedure for testing the LWCO functionality.
Covers defects for one year from installation.
Covers pressure vessel defects for five years.
Covers heat exchanger defects for the lifetime of the purchaser.
Lists conditions voiding the warranty.
Steps to follow when seeking warranty service.
| Brand | New Yorker |
|---|---|
| Model | AP-590U |
| Category | Boiler |
| Language | English |








Loading...