Examine the boiler shipment for any signs of damage upon delivery.
Position the boiler in its final location, considering smoke pipe connection and floor type.
Ensure adequate air supply for proper combustion, potentially requiring screened openings or ducts.
Safely remove all packaging, protective spacers, and secure bolts from the boiler.
Move the boiler to its final location and inspect combustion components before operation.
Connect supply and return piping, ensuring proper clearances and system fill procedures.
Connect tankless heater piping and install smokepipe with draft regulation.
Install electrical wiring and ensure fuel lines are airtight for oil systems.
Inspect installation, fill system, check controls, lubricate, set controls, and adjust burner assembly.
Start the oil burner, adjust oil pressure, and perform other adjustments like air band/shutter.
Test thermostat, primary control, high limit, and perform boiler/system cleaning procedures.
Guidance on nozzles, leaks, water, cold oil, flame shape, and installation issues.
Procedures for non-operation, control switching actions, and safety information.
Detailed steps for cleaning boiler flueways, top sections, and the firebox.
Reinstall all components including canopy, flue plates, and panels after cleaning.
Exploded view and parts list for the bare boiler assembly components.
List and illustration of flush jacket and trim/controls assembly components.