EasyManua.ls Logo

Nibe AG-WT10 - Recovery and Battery Disposal

Nibe AG-WT10
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.
Drill a hole at a suitable angle and with a diameter
of about 65 mm. Insert and adjust a plastic pipe.
2-5°
5.
Prepare installation of the wall mounting.
6.
Install the wall mounting on the wall using suitable
screws. Ensure that the unit is properly mounted
on the wall to prevent noise and vibrations.
7.
When connecting cooling pipes to the right or left,
cut off the casing's groove.
8.
Cables for external sensors must enter on the right-
hand side. The condensation collection box is
equipped with outlet points with pipes on the
right-hand side and rubber plug on the left-hand
side.
AG-WT10Chapter 5 | Installation8

Other manuals for Nibe AG-WT10

Related product manuals