Transport
Transport
F110 should be transported and stored vertically in a
dry place. However. the F110 may be carefully laid on
its back when being moved into a building. The centre
of gravity is in the upper part.
R
0
+2
0
-2
1
R
0
HM flow
49 (50) °C
Hot water
51 °C
+2
0
-2
1
R
0
HM flow
49 (50) °C
Hot water
51 °C
R
0
Assembly
Position F110 on a firm base that can take the weight,
preferably on a concrete floor or foundation. Use the
product's adjustable feet to obtain a horizontal and
stable set-up.
30 - 50 mm
30 - 50 mm
15 - 40 mm
The area where F110 is located must be equipped
with floor drainage.
F110 must be positioned with the back towards a
wall. Install F110 with its back to an outside wall,
ideally in a room where noise does not matter, in
order to eliminate noise problems. If this is not pos-
sible, avoid placing it against a wall behind a bed-
room or other room where noise may be a problem.
Wherever the unit is located, walls to sound sensitive
rooms should be fitted with sound insulation.
Route pipes so they are not fixed to an internal wall
that backs on to a bedroom or living room.
5Chapter 2 | Delivery and handlingNIBE™ F110