Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. In addition, fill in the page for the installation data in the User Manual.
DateSignatureNotesDescription
Brine side
System flushed
System vented
Antifreeze
Level/Expansion vessel
Filterball (particle filter)
Safety valve
Shut off valves
Circulation pump setting
Heating medium side
System flushed
System vented
Expansion vessel
Filterball (particle filter)
Safety valve
Shut off valves
Circulation pump setting
Electricity
Connections
Main voltage
Phase voltage
Fuses heat pump
Fuses property
Outside sensor
Room sensor
Current sensor
Safety breaker
Earth circuit-breaker
Set emergency mode in menu 7.1.8.2
5Chapter 1 | Important informationNIBE S1255

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nibe S1255-6 and is the answer not in the manual?

Nibe S1255-6 Specifications

General IconGeneral
ModelS1255-6
Output6 kW
Power Input Heating1.5 kW
RefrigerantR410A
Dimensions (HxWxD)1800x600x620 mm
Energy efficiency class heating 35°CA+++
TypeHeat Pump
COP Heating5.8 (at A7/W35 according to EN14511)
Integrated hot water tank180 liters
Energy efficiency classA++