20 NIBE VVM 300
Installation
LEK
A
r
t.n
r
.
611??
?
2
1
bar
3
04
Gammalt
4
2
34
Effektvakt 100
230 Va c
L N
1234 67
8
10 12 13 14
FIGHTER
Huvudsäkring
3 st strömkännare
30.1 30.2
A
B
C
44
4
L1
L2
L3
44
34
Electrical connections
FIGHTER 2020 VVM 300
Modular cable between VVM 300 and
FIGHTER 2020
For communication between VVM 300 and FIGHTER
2020, use the supplied 15 m modular cable. The modu-
lar cable is connected between VVM 300 terminal (4) and
FIGHTER 2020 position (44), see relevant Installation and
Maintenance instructions. The routing of the modular
cable in FIGHTER 2020 should be from behind through the
cable glands on the heat pump’s left-hand side, seen from
the rear. The routing of the modular cable in VVM 300
should be made through the HP pipe, Ø 25, to the left and
down to the left-hand front edge.
NOTE! To prevent interference, sensor cables and commu-
nication cables must be separated (min 20 cm) from high
voltage cable when cable routing.
FIGHTER 2020
VVM 300
LEK
LEK
Dold!
15
17
70
95
71
103
7
86
33
90
102
FIGHTER 2020 backside
VVM 300