INSTRUCTIONS
INSTALLATION
Before installing the machine, check the packaging and machine for damage. If the
packaging is damaged, the machine might also be damaged. If there is damage to both
packaging and machine, do not throw away the packaging. The machine has been
inspected and packed at the factory and is expected to arrive to you in new, undamaged
condition. However, rough handling by carriers or others might result in damage to the
machine while in transit. If so, do not return the machine to the manufacturer. Instead,
contact the carrier and ask them to send a representative to the site to inspect the
damage and complete an inspection report. You must contact the carrier and the dealer
that sold you the machine within 48 hours of receiving the machine.
While unpacking the machine, ensure that there are no missing parts. If an item is
missing, contact the manufacturer immediately.
The machine must be level in its operating location to prevent damage to the machine
during operation and to ensure the best results. The machine comes with four adjustable
bullet feet, which can be turned using a pair of channel locks (or by hand if the machine
can be raised safely). Ensure that the machine is level from side-to-side and front-to-
back before making any connections.
Plumbing connections must comply with all applicable local, state, and national
plumbing codes. The plumber is responsible for ensuring that the incoming water line
is thoroughly ushed before connecting it to any component of the machine. It is very
important to remove all foreign debris from the water line that might potentially get
trapped in the valves or cause an obstruction. Any valves that are fouled as a result of
foreign matter left in the water line—and any expenses resulting from this fouling—are
not the responsibility of the manufacturer.
A water hardness test must be performed to determine if a water treatment system
needs to be installed.
If water hardness tests at greater than 3 GPG, install the Scaltrol Water Treatment
system (see the Plumbing Options page) into the water line before the machine’s
incoming water connection point. A water shut-o󰀨 valve should be installed to allow
access for service.
If water hardness tests at lower than 3 GPG, install the water supply line directly to
the machine’s incoming water connection point. A water shut-o󰀨 valve should be
installed to allow access for service.
INSPECTION
LEVELING
UNPACKING
PLUMBING
A water hardness test
MUST be performed.
Do not throw away
packaging if damage is
evident!
WATER SUPPLY
CONNECTION:
WATER HARDNESS
GREATER THAN
3 GPG
WATER SUPPLY
CONNECTION:
WATER HARDNESS
LOWER THAN 3 GPG
The plumber MUST ush
the incoming water line!