EasyManua.ls Logo

Nordson AZO E650 - Maintenance

Nordson AZO E650
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Part 7580607_01
E 2018 Nordson Corporation
Maintenance
WARNING: Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
NOTE: Maintenance procedures given here are for the general assembly
only. Refer to your system component manuals for maintenance procedures
for all other system equipment. For all maintenance requirements of the
rotary sieve, please refer to the AZO E360B technical manual; this can be
supplied by Nordson upon request.
Daily Maintenance
Note: You may need to perform these procedures more or less often,
depending on your application requirements.
Component Maintenance Procedure
Cables, Tubing, and
Feed Hoses
Check all external cables, powder hoses, and air tubing for damage. Repair or
replace as necessary
HDLV Transfer Pumps Purge the pumps. Inspect the pinch valve body for s igns of powder leakage. If
powder is present in the pinch valve section, replace the pinch valves. Refer to
the Prodigy HDLV High- Capacity pump manual for repair procedures
Powder Supply Check the powder supply level regularly and add powder a s necessary
Compressed Air Supply Check the compressed air dryers and filters. Drain filters if needed. Perform
maintenance as necessary
Enclosure Clean the interior and exterior of the Rotary Sieve Assembly. Check all
equipment ground connections
Venting Check and clean sieve and hopper venting hoses
Hopper Check hopper fluidisation is correct. Gently simmering evenly.

Related product manuals