Retrofit Kit DuraBlue/VersaBlue 25L and 50L Melters
24
Part 1105309A
E 2010 Nordson Corporation
Install the Tank Lid Components (contd)
13. See Figure 10. Route the level probe cable as shown. Provide enough
slack for the lid to open and close freely. Coil the extra cable and secure
it to the bracket with cable ties from the ship‐with kit.
Figure 10 Route the level probe cable
14. See Figure 8. Remove one screw from the underside of the tank flange
and install the spade terminal from the ship‐with kit.
15. Route the groundwire from the lid assembly as shown and connect the
spade terminal.
16. Replace the rear and right side panels.