Fulfill
Retrofit Kit − DuraBlue/VersaBlue 25L and 50L Melters
25
Part 1105309A
E 2010 Nordson Corporation
Install the Control Box/Regulator Assembly
1. See Figure 11. Thread a customer supplied, 14-18 AWG power cord into
the control box.
2. Connect the power wiring to the terminal blocks in the control box.
2
1
3
Figure 11 Connect the customer-supplied power cord to the control box
1. L1-L2/N wire power cord connection
(interchangeable)
2. Ground wire power cord connection
3. Power cord strain relief
3. Tighten the strain relief.