EasyManua.ls Logo

Noritz EZTR40 - Initial Operation Procedure

Noritz EZTR40
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Initial Operation
Before the rst use of your water heater, make the following preparations.
Follow steps
1through4
.
1
Open the water supply valve.
Open a hot water xture to conrm that
water is available, and then close the
xture again.
3
Open the gas supply valve.
Hot water xture
2
Plug into power.
CLOSED
4
OPEN
Donottouchwithwethands.
Please check the following when you use the water heater for the rst time after the installation.
Usually, the hot water is supplied by opening the hot water if gas, water, and electric power are
supplied (if there is a remote controller, it should be turned ON).
SBB809KT_001_015_E_J.indd 10 2014/08/01 16:33:20

Other manuals for Noritz EZTR40

Related product manuals