27 | Start Up
RH Start Up Checklist
Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________ Voltage: ________V/______ph
Cylinder Type: Customer/Job: Address:
PRELIMINARY:
Pre-start-up checklist completed? yes F no F
If no, perform Pre-Start-up Checklist before starting humidifier.
START-UP PROCEDURE:
The prerequisites for the humidifier filling and contactor pulling in to make steam are as follows:
Front cover in place and secured with screws yes F no F
Water supply valve opened yes F no F
Mains disconnect switched on yes F no F
Turn On/Off switch on yes F no F
On/Off security loop (Terminal 1 and 2) closed. yes F no F
Fan security (Terminal 8 and 9) closed yes F no F
CONTROLS:
Installed controls match configuration yes F no F
Control Setpoint: High Limit Setpoint:
> 3 VDC on terminal 4 (Modulating Humidistat) yes F no F
or
Terminal 1 and 2 closed (On/Off Humidistat) yes F no F
The Humidifier will undergo a self-test when the power is turned on activating the LED’s and other
internal components.
If the above listed prerequisites are fulfilled the humidifier will start filling the cylinder and begin
normal operation.
REMARKS:
Started by:
Date of Start Up: _______/_______/______
Company:
Note: Most water does not contain enough conductivity for full boil on initial start-up. Units
will need to concentrate the water over a time period (hours to days).