EasyManua.ls Logo

Nortec RH - Start up Checklists; Rh Pre-Start up Checklist

Nortec RH
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start Up | 26
RH Pre-Start Up Checklist
Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________ Voltage: ________V/_____ph
Cylinder type: Customer/Job: Address:
WATER QUALITY:
Well water F City water F Softened water F
HUMIDIFIER MOUNTING: (Clearances around the unit Acceptable Obstruction)
Level Front Clearance 36 in. F
STEAM LINE(S):
Material F Diameter / Size F
Slope up (min 2 in/ft) F Slope down (min 0.500 in/ft) F
Low point condensate traps F No hose kinks / Restrictions F
Type of Insulation
CONDENSATE LINE(S):
P Trap min 6 in or duct press + 2in F P Trap min 12 in drop F
WATER LINE:
1/2 in to within 4ft of unit F Water pressure: 30-80 psig F
DRAIN LINE:
Air gap within 3 ft of the unit F Diameter / Size F
CYLINDER:
Seated in drain valve and secured yes F no F
WIRING:
Wiring connections and connectors secured yes F no F
CONTROLS:
On / Off / Security loop devices working correctly yes F no F
Jumper J10 set to
Modulating (removed) F
Or
On/Off (installed) F
Control Location
High Limit Location
POWER:
Voltage, amp, fuse per Spec Label: yes F no F
Disconnect switch located close to humidifier yes F no F
Panel Number
Inspected by:
Date of inspection: ______/_______/______
Company:

Related product manuals