EasyManua.ls Logo

Nussbaum Jumbo NT - Quick Guide: Leveling Procedure - Part 1; Initial Lift Positioning and Oil Fill; Opening Leveling and Emergency Screws

Nussbaum Jumbo NT
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Made in Germany
Quick guide
The lift must park in the lowest position,
connected to the hydraulic system filled with
approximately 14L oil.
Open leveling screws A1 and A2 (max. 1 turn),
and press the “lowering” button about 5
second.
Lifting the platforms without load to the top-
end position (the platform is unevenly high and
is slightly oblique in the final position, the
cylinder levers are not parallel).
Open the emergency-drain screws N1 and N2
(the lift is lowering to the lowest position)
Close the emergency-drain screws N1 and N2.
Leveling screws A1 and A2
Emergency-drain screws N1 and N2

Other manuals for Nussbaum Jumbo NT

Related product manuals