EasyManua.ls Logo

nvent JBS-100-A - Page 8

nvent JBS-100-A
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Weather seal
–WS
©2001 www.nVent.com
RAYCHEM
17
18
• Install lid.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Leave these instructions with the
end user for future reference.
nVent recommends the use
of a conduit drain to prevent
water condensation build-up.
Make sure
conductors are
not exposed.
Conduit
drain
3/4 in locknut
Water tight
conduit seal
1/2 in
(13 mm)
Power and ground wires
nVent.com | 8Raychem-IM-H56046-JBS100A100A6- ML-1805
• Install conduit and fittings as shown. To
minimize loosening due to pipe vibration, use
flexible conduit.
• Pull in power and ground wires, strip off 1/2 in
(13 mm) of insulation and terminate.