EasyManua.ls Logo

Oasis Kalix - Final System Flush and Completion

Oasis Kalix
10 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Kalix Sanitisation Procedure.
TECHNICAL
BULLETIN
OAS0033A
181218
OAS0033A
10
Diagram 14.1 Diagram 14.2
Replace side panel onto the cooler. Position the key slot in panel on the screw in the front
fascia, and slide panel downward over locater in moulded base
Affix 3 screws in position illustrate in (Diagram 14.2).
Diagram 14.3 Diagram 14.4
Reposition top of Kalix as per (Diagram 14.3)
Slide top over push buttons, then secure in position via two screws at the back of the cooler.
Ensure cup dispenser is firmly in position before securing screws.
Return filter compartment door to its exact position, then replace drip tray to its place.
14. Finally the new filtration system needs to be flushed out of the cooler.
Turn on mains water supply and connect electrical supply to the cooler.
First dispense water from the cold side of the cooler for 2 minutes.
Then dispense water from the cook side of the cooler for 60 seconds.

Related product manuals