5. Feed tubing up through bushing in top and attach
top to cooler. If flow switch was installed, cord from
flow switch must also pass through this bushing.
C: Mounting the frame to the wall
1. Place rubber gasket on top of the cooler so it is centered left/right
and against the wall.
Section 3: Installation: Final steps for both product families:
TIP: For the P8AM, it is easier to
connect the outlet tube to the bubbler if
the front nose is removed.