EasyManua.ls Logo

Olimpia splendid Unico Air - Unit Assembly and Installation Details; Unit Assembly and Wall Drilling; Condensate Discharge Preparation

Olimpia splendid Unico Air
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
w
I
To
prevent
the creation
of large
amounts
of dust
and rubble
due to
drilling,
the core
borer can
be fitted
with a vacuum
system
applied
by
means
of suction
cups
to
the drilling
zone.
Our Service
Department
can
give you
all necessary
information
to
enable
you
to find these
devices.
To
drill
the holes,
proceed
as follows:
Fasten
the
drilling
template
to
the wall
leaving
the
necessary
space from
the ceiling,
floor
and side
walls as
shown
on the
template
that
may
be
fixed
using adhesive
tape.
Use a
small
drill or
punch
to
mark,
with
extreme
care,
the exact
centre of
each of
the holes
to be drilled.
Using
a core boring
head
measuring
at least
162
mm to
drill the two
holes for
entry
and exit of
the air.
n:F-
wARNING:
drilltheforegoing
holes
tilted
slightly
downwards
to
preventwaterfrom
being fed
backthrough
the ducts
(fig.5).
2.3.3
Most
of
the removed
material
is expelled
outwards,
therefore
make
sure that it
does
not hit any
person
or object
when it
falls
out.
ln order
to
avoid as
much as
possible
outer
plaster
breaking, it is
necessary
to
proceed
carefullywith
the last
part
of hole
execution,
decreasing
pressure
on core
borers.
Next,
drill the
holes
for anchoring
the
fastening
brackets
to the wall
using
as a first
option
the 4 holes
on
the ends
of the
bracket
as shown
on
the drilling
template.
lf
the wall
is not
very
solid, it
is advisable
to
use some
extra anchor
bolts.
As
you
can see,
the bracket
can
be fastened
in
a number
of different
ways
and
positions.
The majority
of
the weight
of the
appliance
is
to the right
side
so ensure
that
fixing
is more
secure
on
this side.The
anchor
bolts
provided
require
holes
with
a diameter
of
10 mm.
ln any
case,
the wall
should
be
inspected
carefully
to determine
the
best
possible
anchorage
and type
of bolts
suitable
for
parti-
cular
situations.
WARNING:
the manufacturer
will not
be held
liable
for any
underestimates
made in
the structural
consistency
of the
anchor
pre-
pared
by the installer.
Therefore, pay
utmost
attention
to the
foregoing
operation
that could
cause
serious injury/damage
to
people/property
if
carried
out
incorrectly.
When installing
models
equipped
with
heating
pump,
if no
condensate
discharge
was
built into
the wall (see
paragraph
2.3.2),
in
order
to
dratn
the condensate
it will
be necessary
to
drill a hole
through
the wall
in the
position
shown
on the
template"
Preparing
the
condensate
discharge
As
far as
machines
equipped
with
a heating
pump
are
concerned,
connect
the
unit to
the condensate
discharge
pipe
(supplied)
by
coupling
it
with the
specific
vent (fig.
6 ref.
A)
that is
on the back
of the
machine
(remove
cap B).
When
the max
level is
reached,
a solenoid
valve
ensures
the
condensate
will flow
out from
the internal
tray. For
cold-only
machines,
connect
the
condensate
discharge
pipe
if
you
intend
running
the unit
at low
outdoor
temperatures (lower
than
23.c).
Since
condensate
drains
by
gravity,
there
must
be
a minimum
slope
of at least
3% at
every
point
of
the discharge
line.
Use
a rigid
or flexible
tube having
an inside
diameter
of at least
16
mm.
lf the
line
empties into
a
sewerage
system,
install
a siphon
before
the
point
in which
the
pipe
reaches
the
main
discharge,
at least
300 mm
below
the inlet
from
the
unit
(fig.
6).
lf
the drainpipe
drains into
a vessel (tank
or
other container),
this container
should
not
be sealed
and
the drainpipe
should
not
remain
immersed
in
the water (see
fig.
7).
The
hole
through
which
the
condensate
pipe
passes
should
always
slope
towards
the outside
(see
fig. B).
The
exact
position
in
which
to
place
the
pipe
inlet,
as
compared
to the
machine,
is shown
on
the drilling
template.
CAUTIoN:
make
sure,
in this
case,
that
the water
expelled
outward
does not
damage
or disturb
persons
or
property.
During
the winter
this
type
of drainage
may
cause
sheets
of ice
to form.
When
the condensate
drainage
is fitted,
pay
much
attention
not
to compress
the rubber
hose.
Assembly
of
the
air ducts
and
external
grids
After
having
drilled
the
holes,
insert
the
plastic
sheet
supplied
with the
conditioner
into
them.
The length
of the
sheets
must
be 6s mm
less
than
the thickness
of the wall.
Roll
the
sheet
and insert
it into
the hole (fig.
9),
paying
attention
to
the splicing
line
(fig.
9
ref.
A), which
must
always
face
upwards.
Use an
ordinary
cutter
for
the foregoing
operation (fig
To
position
the
external
grids,
proceed
as follows:
-
Apply
the seal
(fig.
10
ref.
B)
to the wail
ftange (fig.
in
the figure.
-
Fix
the two
flanges
using
2
pegs
having
a
diameter
of 6
and check
that
the two fixing
holes
are
horizontal.
-
Fit
the small
eyelet
of
the spring,
with
the long
stem,
on the
cap
pin
(on
both
components)
(fig.
11
).
-
lnsertthetwocaps(withspring),onthefrontpartof
theexternal
grid,onitstwohousings,pullinguntil
itclicks(fig.
12) anc
&
OLIIWPIA
R"JI
SPLENDID
i
I
I
30
2.3.4
a
e).
10 ref.
A),
ensuring
it lines
up with
the
outer edge
of the
flange
as indicate:
I

Related product manuals