7IO-Link Connection Procedure
26
4
The dialog box on the right is
displayed. Confirm that there is
no problem, and click Yes.
5
Check that "0 Errors" and "0
Warnings" are displayed on the
Build Tab Page.
6
Select Online from the
Controller Menu.
When an online connection is
established, a yellow line is
displayed under the toolbar.
7
Select Synchronize from the
Controller Menu.
8
The Synchronization Dialog Box
is displayed.
Check that the data to transfer
(e.g. NX102) is selected.
Uncheck the box for Do not
transfer the following. (All items
are not transferred.) to make the
unit operation settings on Slave
Terminal transferable.
Click Transfer To Controller.
*After you click on the button,
the Sysmac Studio data will be
transferred to Controller, and
the data will be synchronized.

Other manuals for Omron NX102 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron NX102 series and is the answer not in the manual?

Omron NX102 series Specifications

General IconGeneral
BrandOmron
ModelNX102 series
CategoryController
LanguageEnglish

Related product manuals