EasyManuals Logo

Onan CCK Service Manual

Onan CCK
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
Ignition
System
GENERAL
These
engines
use
either
a
magneto
ignition
system
or
a
battery
ignition
system.
Each
system
and
the
spark
advance
mechanism
are
described
in
this
sec¬
tion.
Correct
ignition
timing
is
stamped
on
the
crank¬
case
near
the
breaker
box
(timing
procedure
given
later).
Spark
advance
is
identified
by
a
raised
cup¬
shaped
cover
on
the
upper
rear
of
the
crankcase
below
the
breaker
box.
Engines
without
spark
ad¬
vance
use
a
fiat
cover
which
is
flush
with
the
crank¬
case.
Figure
32
shows
magneto
ignition
while
Figure
34
shows
the
battery
ignition
system.
MAGNETO
The
magneto
coil
assembly
is
mounted
on
theengine
gear
cover.
The
flywheel
must
be
removed
to
expose
it.
The
magneto
coil
assembly
has
only
one
set
of
mounting
holes.
Connect
the
smaller
(ground)
coil
•pad
to
the
magneto
coil
assembly
mounting
screw
hgures
32
and
33.
Connect
the
larger
magneto
coti
assembly
lead
to
the
breaker
box
insulated
terminal
Figure
32.
The
magneto
coil
used
on
engines
with
spark
advance
mechanism
includes
both
the
primary
and
secondary
windings.
FIGURE
32.
MAGNETO
IGNITION
SYSTEM
IF
FLYWHEEL
RUBS
ON
POLE
SHOE
LOOSEN
POLE
SHOE
MOUNTING
SCREWS.
TAP
POLE
SHOE.
AND
RETIGHTEN
MOUNTING
SCREWS.
FIGURE
33.
MAGNETO
STATOR
ASSEMBLY
BREAKER
POINTS
To
maintain
maximum
efficiency
from
the
engine,
change
the
breaker
points
every
200
hours
of
opera¬
tion
Proceed
as
follows:
1
Remove
the
two
screws
and
the
cover
on
the
breaker
box.
2
Remove
the
two
spark
plugs
so
engine
can
be
easily
rotated
by
hand.
If
plugs
have
not
been
changed
within
the
last
100
hours,
replace
them
with
new
ones
after
setting
the
breaker
points.
3
Remove
the
two
mounting
screws
(A)
and
pull
the
points
out
of
the
box
just
far
enough
so
screw
(B)
can
be
removed.
See
Figure
35.
Replace
points
with
a
new
set
but
do
not
completely
tighten
mounting
screws
(A).
4.
Rotate
the
engine
clockwise
(facing
flywheel)
by
hand
until
points
are
fully
open.
Turn
screw
(C)
until
point
gap
measures
.020inch
(0.51
mm)
with
a
flat
thickness
gauge.
5.
Tighten
mounting
screws
and
recheck
gap.
6.
Proceed
to
Ignition
Timing.
Each
time
new
breaker
points
are
installed,
place
a
drop
of
oil
on
the
point’s
pivot
point
(Figure
35}.
IGNITION
TIMING
Ignition
Timing
Engine
Running:
Always
check
37

Other manuals for Onan CCK

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Onan CCK and is the answer not in the manual?

Onan CCK Specifications

General IconGeneral
Cylinders2
Ignition SystemBattery ignition
Fuel TypeGasoline
Cooling SystemAir-cooled
Fuel SystemCarburetor
StarterElectric
GovernorMechanical
Max RPM1800 RPM
Engine Type4-cycle
Bore and Stroke3.25 x 3.625 inches (82.55 x 92.08 mm)

Related product manuals