EasyManua.ls Logo

OneTouch Select - Page 45

OneTouch Select
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control solution testing
Performing a control solution test
Start with the meter off. If you have turned the
meter on to change settings or review past
results, turn it off.
1. Check the code on the test strip vial before
inserting the test strip
2. Insert a test strip to turn on the meter
Make sure the three contact bars are facing
you and the arrow is pointing down. Push
the test strip in as far as it will go. Do Not
bend the test strip.
NOTE:
Use only OneTouch
®
Select
or OneTouch
®
Select
High Control
Solution with your OneTouch
®
Select
Meter.
Control solution tests must be done at room temperature (68–77°F).
Make sure your meter, test strips, and control solution are at room
temperature before testing.
39

Other manuals for OneTouch Select

Related product manuals