9
MACHINE UNPACKING
MACHINE INSTALLATION INSTRUCTIONS
Note: Gently place each battery into the battery cabin to
avoid damage to the battery and the machine.
1. Please carefully check whether there is damage on the packing box of the machine. If there is, please imme-
diately contact the shipping carrier.
2. Unpack on a level and at surface.
WARNING: Fire or explosion hazard: The battery releases hydrogen. Please be away from
spark or open ame. The battery cover must be kept open when charging.
FOR SAFETY: Please wear protective gloves and eye protectors when treating the battery and battery
wiring when repairing and servicing the machine. Avoid contacting the battery acid.
Battery Installation
Battery Specication:
Two 12V 120Ah AGM Maintenance Free Batteries connected
in series to produce total battery power pack of 24 volt, 120
Ah AGM Maintenance Free Batteries.
1. Stop and place the machine on the level ground and take
out the key. Lift up the recovery tank to expose the battery
cabin.
2. Carefully install the two 12V batteries in the battery cabin
and connect the battery cable according to the following
gure:
3. Before connecting the battery, please rst ensure whether the electrodes
and electric terminals are clean. Use electrode cleaning uid and wire brush as
required.
4. After the battery is installed, please check the scale of the battery power
meter. Charge the battery as required.
Hint: Paint a thin layer of metal-free lubricating oil or
protective spray on the connected wiring to avoid battery
corrosion.
+
-
+
-