EasyManua.ls Logo

Opt OPT-DPA1024E-4 - DIN Guide Rail Installation; Screw Installation; Installation Size

Opt OPT-DPA1024E-4
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPT MACHINE VISION TECH.CO. LTD
ADD:8 JingSheng Road, JingXia ChangAn DongGuan China 523853
TEL: 0769-82716188 FAX: 0769-81606698
E-mail:optmv1@optmv.com Website:Http://www.optmv.net
11
2.1 DIN guide rail installation
1Installation (Fig.2.1): (1) Lock the controller back panel DIN rail track to position 1 rail.
(2) Push down controller toward position 2.
2Uninstallation (Fig.2.2): (1) Pull down the controller.
(2) Push up toward position1.
2.2 Screw installation
Installation (Fig.2.3):
1Secure back-plate against controller.
2Tighten the screws.
3Tighten the back-plate to fixtures or stations.
2.3 Installation size
Fig.2.2: Guide rail Uninstallation
Fig.2.4: DIN guide rail size
Fig.2.3: Screws installation
Fig.2.5: Screw size
position 1
position 2
Fig. 2.1: Guide rail installation

Table of Contents